Are water detention requirements holding your projects back?Our range of innovative water tank products provide solutions for every challenge; even for difficult sites that could not otherwise be developed.
The gorgeous Wairua apartments in Remuera by Clearwater Construction Ltd feature 88 Aquacomb pods hidden in the foundation slab of the basement parking lot. Our technical design experts worked with Flowpath Engineering & +MAP Architects to ensure all stormwater requirements were met – resulting in 22,000L of Aquacomb pods being installed for detention only.